മലയാളം
background

Design, Supply, Installation and Commissioning of 5kWp Hybrid SPV Power Plant with Battery Backup at GMLPS Kallarmangalam, Malappuram

Design, Supply, Installation and Commissioning of 5kWp Hybrid SPV Power Plant with Battery Backup at GMLPS Kallarmangalam, Malappuram

Published Date :2025-01-22 | Last Date :2025-01-31

Design, Supply, Installation and Commissioning of 5kWp Hybrid SPV Power Plant with Battery Backup at GMLPS Kallarmangalam, Malappuram



E-TNDER ID : 2025_ANERT_729303_1


Tags


Solar Power Plants