മലയാളം
background

Reconditioning Work- To Convert an Existing 6kWp Off- Grid SPV Power Plant into a 6kWp Hybrid SPV Power Plant with 1 Hour battery backup at Thenhippalam Gramapanchayath Office Building, Malappuram

Reconditioning Work- To Convert an Existing 6kWp Off- Grid SPV Power Plant into a 6kWp Hybrid SPV Power Plant with 1 Hour battery backup at Thenhippalam Gramapanchayath Office Building, Malappuram

Published Date :2024-10-09 | Last Date :2024-10-18

Reconditioning Work- To Convert an Existing 6kWp Off- Grid SPV Power Plant into a 6kWp Hybrid SPV Power Plant with 1 Hour battery backup at Thenhippalam Gramapanchayath Office Building, Malappuram




E-TNDER ID : 2024_ANERT_695644_1


Tags